portfolio

Exterior Jobs


Gibson Job


For this job, we removed the old deck boards and replaced them with new boards, and rebuilt the built in bench.

Winzer Construction



Kitchen Jobs


Roxborough Job


For this job, we removed the old cabinets, flooring and stucco ceiling. We tiled the floor, installed new drywall on the ceiling, installed electrical outlets and under counter lighting, painted and installed the cabinets.

Winzer Construction

Bulls Job


For this job, we removed the existing kitchen and installed new tile flooring, constructed a bulkhead for the cabinets, painted, designed the kitchen layout and installed the new cabinets.

Winzer Construction

Crawford Job


For this job, we installed the cabinets and modified the island cabinet to fit the oven.

Winzer Construction



Bathroom Jobs


Silverthorn Job


For this job, we completely gutted the bathroom and leveled the floor, as well as installed 3 windows.

Winzer Construction

Frathouse Bathroom Job


For this job, we installed a shower unit, toilet, vanity, did plaster repair and painted.

Winzer Construction

Pottelberg Bathroom Job


For this job, we completely gutted the upstairs bathroom and rebuilt it to the customers specifications, as well as painted, tiled, and installed a new vanity, toilet and fan in the downstairs bathroom.

Winzer Construction

Furret Bathroom Job


For this job, we gutted the shower unit and rebuilt the floor pan, installed a new drain and tiled.

Winzer Construction

Sohal Job


For this job, we gutted the bathroom, installed a complete waterproofing kit, installed a fan with timed switch, tiled the floor and tub surround, installed the vanity, and painted.

Winzer Construction




Flooring Jobs


Hoque Job


In this condo, we removed the old carpet and installed laminate flooring

Winzer Construction

Sohal Job


For this job, we installed laminate flooring.

Winzer Construction



Interior Jobs


Bulls Job


For this job, we removed the old flooring and subfloor in the entire first floor, removed the wood wall panelling in the back bedroom, removed the old stucco ceilings, removed a load bearing wall and installed a support beam, levelled the floor joist's and installed plywood subfloor, installed hardwood flooring, drywalled the ceilings and back bedroom, painted the first floor, installed custom door and window framing, installed a custom made flooring bullnose, installed a custom window sill, installed stair railing, tiled the front entrence, and installed new mouldings in the first floor.

Winzer Construction

Hinge Hardware Job


For this job, we framed the office walls, break room area, bathroom dividers, product placement walls and the storage area divider wall. All walls were drywalled, plastered, sanded and painted. The floor was tiled and baseboard was installed.

Winzer Construction






News

To book a free estimate, please contact us.


©all rights reserved, Winzer Construction, 2006